Tuesday, June 4, 2013

A million percent better

The construction is finally done on our master bathroom. We need to hang the beach photos we chose, but other than that, we're good to go.

The process went fine until it was time for the glass to be installed around the shower.

The contractor said the whole job would take four weeks. So he ordered the shower glass at the halfway point. He said it usually takes a week for the glass to arrive, then a week to install. We have another full bathroom upstairs, so we basically told him that we wanted this job done once and done right, no matter how long it took.

So he ordered the glass, and a week and a half later, he got an email saying the glass he ordered was discontinued. Great!

So the contractor had to custom order the glass, which takes six weeks.

And then the custom order glass came back missing a piece. Reorder.

Then the reorder came back wrong.

Luckily, the glass pieces were right, and the contractor could make adjustments on the other parts. He came back to do a few touch-ups, and I think we're finally done.

Here are some before and after pictures: